News

How to installation the stationary concrete batching plant

How to installation the stationary concrete batching plant
1.The concrete batching machine should be installed in the flat and solid place.
2.Before working, we should be strictly in accordance with the instructions to add grease. Check circuit, protective device, etc. to see if they are in good condition.
3.Check the linkage parts of the transmission belt and discharge gate to see if there is blockage, and the measurement is qualified, then have the trial operation for 2 - 3 minutes, if the operation is normal, it can be put into the work.
4.Having the welding repair to the concrete batching machine. We should remove the sensor when the batching machine is transported, so as not to damage the sensor.
5.The electronic measurement system of the batching machine should be carried out calibration in accordance with the provisions.
6. After working of the concrete batching plant machine, we need to fill in the operation records and maintenance records, and do a good job of daily cleaning and maintenance, to make the concrete batching machine neat, clean, lubricant and beautiful.