The weekly inspection project of batching plant
The weekly inspection project of batching plant:
1. Check the wear of the wire rope and apply a little oil on the surface. After the wire rope is worn to a certain extent, it should be replaced.
2. Check the oil level of the gearbox and the oil volume of the oil pump, check the condition of each lubrication part, and add lubricant to the paint wheel bearing and pulley bearing.
3. The water supply device should be kept clean to avoid blockage, and the suction valve should be cleaned once.
4. Check if the travel switch rocker arm is loose. If it is loose, it should be adjusted.
5. Check if the blade connecting bolt and the support arm connecting bolt are loose and adjust as appropriate.
6. Check the contactor contacts in the electrical box.
7. Unscrew the plug, check the shaft end seal, and make necessary adjustments, repairs and replacements.