The work flow of stationary concrete batching plant

Do you really know the workflow of the stationary concrete batching plant, or do you know about it? The operation sequence of concrete mixing station is very important, which requires you to master skillfully, so as to avoid many accidents. Here, under the unified specification of professional batching plant manufacturer, if there are other questions, you can consult us (Email:sarah@concretebatchplant24.com)directly.


The work flow of stationary concrete batching plant:
1. Feeding (the process of putting raw materials into a weighing hopper)
Aggregate feeding: according to the formula, open the corresponding aggregate bin valve weighing opening the hopper door closing the feeding door closing the feeding door conveyor belt to the waiting bin. In this process, start the shock machine, after feeding, the shock machine is delayed 1S closing.
Cement feeding: according to the formula to choose the cement silo start feeder weighing, this process according to the needs of manual arch breaking. Powder feeding: according to the formula to select ore silo or fly ash silo start feeder weighing, this process according to the needs of manual arch breaking.
Additive feeding: start feeder weighing weighing hopper valve opening feeding end weighing door closing conveyor belt feeding to the waiting bin, this process has pneumatic hammer shock weighing hopper, after feeding end, delay closing shock air valve. Water Feed: Start Water Pump Weighing
2. The feeding process should delay the feeding time of each aggregate to prevent belt overload. Normal shutdown requires downstream shutdown, and both belts are stopped when emergency shutdown occurs.
3. Check whether the unloading door of the concrete mixer machine is closed after all feeding and feeding. Open the waiting bin-powder bin-water agent bin valve and put it into the cement mixer. The time of water agent input should be slightly earlier than that of other materials. There is a shock machine on the warehouse.
4. After mixing all materials into the diesel concrete mixer, start mixing end mixing unloading, if the cycle production, mixing at the same time feeding and feeding work, unloading after the completion of closing thediesel discharging door; mixer discharging door is equipped with a stroke switch indicating that the door is half open, fully open, fully closed.